Navigational Toolbar

Wednesday, March 12, 2014

2ND NIGER BRIDGE, ONITSHA IN NIGERIA.


President Goodluck Jonathan Flags off the Construction of 2nd Niger Bridge in Onitsha, Anambra state.

The Six Lane Bridge which is about 1,590 metres long and forms part of the 11.90 km length project. It has double lane and a Speed train track.

The project is expected to be completed in 48 months. The bridge structure is also designed to ensure effective use of the Sea Port.

According to
President Jonathan ,"It is an important economic artery that will connect the great markets of Onitsha and Aba, as well as the industrial hub of Nnewi and beyond, to both the Northern and Southern parts of our country".

This is a good development.

No comments:

Post a Comment